P1060236

Proposed ATB Terminal and Jetty Top-Side Facilities for the ...

Project Description Client : PEC (MALAYSIA) SDN BHD Location : Malaysia (Tanjung Bin, Johor Bahru) Scope of work : Storage Tanks Erection & Surrounding Civil Work Project Period : Dec 2010 – May 2012 Status : Completed ...
IMG_4251

Tankage Work Shell PD 120 LOBP Project

Project Description Client : PEC (Malaysia) Sdn. Bhd. Location : Tankages Work Scope of work : RC Pit, Earthwork, Foundation, Pipe Sleepers Project Period : Apr 2011– May 2011 Status : Completed ...
SAM_2460

EPCC of 10,000m3 Bitumen Tank

Project Description Client : Kemaman Bitumen Company Sdn Bhd Location : Malaysia (Kemaman, Terengganu) Scope of work : Engineering, Procurement, Construction, Testing and Commissioning of 10,000m3 Bitumen Tank Project Period : Dec 2010 – Aug 2011 Status : Completed ...
005

Condensate Tank for Bintulu Crude Oil Terminal

Project Description Client : Overseas Manufacturing (Johor) Sdn. Bhd Location : Malaysia (Bintulu, Sarawak) Scope of work : Tankage Project Period : June 2011 – Dec 2011 Status : Completed ...
Photo-0129

Crude Pipeline For LCB Jetty Project

Project Description Client : Kemaman Bitumen Company Sdn Bhd Location : Malaysia (Kemaman, Terrengganu) Scope of work : Crude Pipeline For LCB Jetty Project Period : Dec 2009 – Mar 2009 Status : Completed ...
Tanjung Langsat Dialog

EPCC of Langsat Terminal One

Project Description Client : OTEC OMJ Location : Malaysia (Tanjung Langsat, Johor Bahru) Scope of work : Erection & Pre-Commissioning of Fuel Oil Storage Tanks Project Period : May 2009– May 2010 Status : Completed ...
DSC01257

PCC of New Storage Tank at Prai Terminal

Project Description Client : Chevron Malaysia Ltd Location : Malaysia (Prai, Penang) Scope of work : Procurement, Construction & Commissioning New Storage Tank Prai Terminal Project Period : Jul 2009 – Feb 2010 Status : Completed ...
OLYMPUS DIGITAL CAMERA

PMLTSA Project for Petronas Methanol (Labuan)

Project Description Client : JFE Engineering (M) Sdn Bhd Location : Malaysia (Labuan) Scope of work : Civil Works, Mechanical & Pipping Works Project Period : Feb 2008 – Dec 2009 Status : Completed ...
1st photo

Pipeline Project for Dung Quat Refinery Petrol Vietnam

Project Description Client : JFE Engineering Corporation Location : Vietnam (Dung Quat) Scope of work : SPM Pipe Spool Fabrication, Supply of Buoyancy Tank, Installation of Offshore & Onshore Pipeline Project Period : 2009 Status : Completed ...
1st photo

FPG Post Hydrogenation Project

Project Description Client : Toyo Engineering & Construction Sdn. Bhd Location : Malaysia (Gebeng, Kuantan) Scope of work : Civil & Steel Structure Works, Mechanical Piping Works Project Period : Sept 2008 – Apr 2009 Status : Completed ...
1st photo

Banyan Phase 4 Project

Project Description Client : Chiyoda Singapore (PTE) Limited Location : Singapore (Bayan Avenue) Scope of work : Shop Fabrication & Erection of Storage Tanks Project Period : Jan 2008 – Feb 2009 Status : Completed ...
5.12.06

EPCC of Package 3 Bulk Depot Facilities and Package 4 ...

Project Description Client : Chiyoda (M) Sdn Bhd / PPES Work Sarawak Sdn Bhd Location : Malaysia (Kuching, Sarawak) Scope of work : Tankage, Piping, Structure Work & Civil Work Project Period : 2006 Status : Completed ...
IMG_2780

Kemaman Bitumen Company Tankage Project

Project Description Client : Sumatec Corporation Sdn Bhd Location : Malaysia (Kemaman, Terengganu) Scope of work : 25 units Tankage Work & Civil Work Project Period : 2006 Status : Completed ...
CIMG1629

Singapore Gas Pipeline

Project Description Client : KT Teknik Sdn Bhd Location : Malaysia (Pasir Gudang, Johor) Scope of work : Fabrication, Installation and Commissioning of Gas Pipeline & Civil Works Project Period : 2006 Status : Completed ...
2004_0830_104752AA

Major Tank Repair Work For Seria Crude Oil Terminal – ...

Project Description Client : Syarikat Kejuruteraan Sistematik Location : Brunei Scope of work : Storage Tank Repairing & Refurbishment Project Period : 2004 Status : Completed ...